Efficient and reliable energy supply networks are a prerequisite for supplying the general public with electricity and gas. The supply should meet the following requirements:
Permission is required to start operating an energy supply network. A licence is required for each individual network. In the case of a distribution network, the spatial delimitation is determined by the respective concession area.
The Ministry of the Environment Baden-Württemberg
Prerequisites are:
You must submit an informal application to the competent body containing information on the following points:
You will receive the decision in writing.
For further information, please contact the competent body.
Application: in good time before the planned start of network operation
The fee range is EUR 300,00 - EUR 50,000.
Decision of the Ministry: within six months after submission of complete application documents
The state of Baden Württemberg offers consumers and network operators comprehensive information on energy supply in its supplier portal. There you will find generally applicable specifications, guidelines and notices and can download applications.
Energiewirtschaftsgesetz (EnWG):
Gebührenverordnung Umweltministerium (GebVO UM):
machine generated, based on the German release by: Umweltministerium Baden-Württemberg, 05.05.2025
Stadt Kuppenheim
Friedensplatz
76456 Kuppenheim
Telefon: 07222/9462-0
Telefax: 07222/9462-150
stadt@kuppenheim.de