You need a licence under water law for hydropower plants.
the lower water authority
The lower water authority is
The main requirements are set out in the Water Resources Management Act (WHG), particularly with regard to continuity, minimum water flow and fish protection.
You must also observe
All of this can lead to a refusal under certain circumstances.
Contact the responsible authority at an early stage. They can clarify in advance whether the location is generally suitable for your hydropower utilisation project.
Tip:If possible, arrangean appointment with the authority for preliminary clarificationon site at the watercourse. Although preliminary clarifications based on only a few documents are helpful for planning the project, they have only limited significancefor the final decision in thesubsequent procedure.
There are therefore different procedures for the actual authorisation:
Tip: Clarify directly with the responsible authority which procedure you need to choose for your project.
none
For preliminary clarifications, you must submit a site plan and a rough design and dimensioning of the system with the important discharge data of the watercourse. These must show the scope and impact of the project.
You can obtain more detailed information from the competent authority.
It is also best to clarify which documents you need for the authorisation procedure with the responsible authority.
are based on
depends on the complexity of the project, for example on the necessary investigations
none
Gesetz zur Ordnung des Wasserhaushalts (WHG):
Wassergesetz für Baden-Württemberg (WG):
Machine generated, based on the German release by: Umweltministerium Baden-Württemberg, 28.05.2025
Stadt Kuppenheim
Friedensplatz
76456 Kuppenheim
Telefon: 07222/9462-0
Telefax: 07222/9462-150
stadt@kuppenheim.de