Serviceportal–Baden-Württemberg
Nachfolgend finden Sie die Verfahrensbeschreibungen der Angebote des Serviceportals BW.
Nachfolgend finden Sie die Verfahrensbeschreibungen der Angebote des Serviceportals BW.
If you operate a waste incineration or waste co-incineration plant, you must continuously measure, record and analyse pollutant emissions. You must prepare a measurement report on the results of the continuous measurements for each calendar year and submit it to the responsible immission control authority.
Locally responsible regional council (Department 5 - Environment).
You are the operator of a plant for the incineration or co-incineration of waste in accordance with the 17th BImSchV.
Complete measurement report
None
Please ensure that you submit the measurement report to the immission control authority responsible for your plant.
Bundes-Immissionsschutzgesetz (BImSchG):
Machine generated, based on the German release by: Umweltministerium Baden-Württemberg, 17.04.2025
Stadt Kuppenheim
Friedensplatz
76456 Kuppenheim
Telefon: 07222/9462-0
Telefax: 07222/9462-150
stadt@kuppenheim.de