Serviceportal–Baden-Württemberg
Nachfolgend finden Sie die Verfahrensbeschreibungen der Angebote des Serviceportals BW.
Nachfolgend finden Sie die Verfahrensbeschreibungen der Angebote des Serviceportals BW.
If you are the operator of a large combustion plant, gas turbine or internal combustion engine plant, you must determine, record and analyse its pollutant emissions on an ongoing basis by means of continuous measurements.
You must prepare a measurement report on the results of the continuous measurements every calendar year and submit it to the responsible immission control authority.
The competent authority for installations that fall under the Ordinance on Large Combustion, Gas Turbine and Internal Combustion Engine Installations (13th BImSchV) is in most cases Department 5, Environment of the locally responsible regional council. In individual cases, the responsibility may deviate from this.
According to the Immission Control Competence Ordinance of the State of Baden-Württemberg (ImSchZuVO), the following applies:
The Departments 5, Environment of the respective locally responsible regional councils are the responsible immission control authorities for company premises on which
exists or is to be constructed.
Department 9, State Office for Geology, Raw Materials and Mining of the Freiburg Regional Council is also the state-wide competent immission control authority for
The locally competent lower immission control authority (district or municipal administration) is the competent authority for all other industrial sites that do not fall under the regulations described above.
You are the operator of a large combustion, gas turbine or internal combustion engine plant in accordance with the 13th BImSchV.
Complete measurement report
None
Please ensure that you submit the measurement report to the immission control authority responsible for your plant.
Gesetz zum Schutz vor schädlichen Umwelteinwirkungen durch Luftverunreinigungen, Geräusche, Erschütterungen und ähnliche Vorgänge (Bundes-Immissionsschutzgesetz -BImSchG):
Dreizehnte Verordnung zur Durchführung des Bundes-Immissionschutzgesetzes (Verordnung über Großfeuerungs-, Gasturbinen- und Verbrennungsmotoranlagen - 13. BImSchV):
Machine generated, based on the German release by: Umweltministerium Baden-Württemberg, 16.01.2026
Stadt Kuppenheim
Friedensplatz
76456 Kuppenheim
Telefon: 07222/9462-0
Telefax: 07222/9462-150
stadt@kuppenheim.de