If you wish to construct a new facility for handling substances that pose a risk to water, or to make significant alterations to an existing facility, or to take measures that result in a change to the risk level, you must notify the relevant authority.
You must submit your notification regarding the construction, substantial modification or change to the hazard level of a facility subject to inspection to the competent authority at least six weeks in advance.
A notification is not required if
Please ensure that you submit your notification to the relevant water authority.
The relevant regional councils (Regierungspräsidien) act as higher water authorities where the notification relates to premises on which at least one installation is present or planned,
The State Mining Authority, Department 9 [Freiburg Regional Council] is responsible throughout the state for premises subject to mining supervision on which one of the above-mentioned installations is located or is to be constructed.
In all other cases:
the competent lower water authority.
The installations must comply with the requirements of the Ordinance on Installations for the Handling of Substances Hazardous to Water (AwSV). This must be demonstrated by the documentation to be submitted.
If you wish to submit the report online:
If you wish to submit the notification by post or email:
Please submit your notification to the relevant authority at least six weeks in advance.
Fees are only payable if the competent authority is required to order additional measures. The basis for calculating the fees is the statutory order and the statutes of the relevant competent authority, as well as the provisions of the State Fees Act.
Processing takes between two and six weeks.
You can also look up water or mineral spring protection areas and floodplains online via the map service of the Baden-Württemberg State Agency for the Environment. Here, you can view flood hazard maps.
Landesbauordnung für Baden-Württemberg (LBO)
Gesetz zum Schutz vor schädlichen Umwelteinwirkungen durch Luftverunreinigungen, Geräusche, Erschütterungen und ähnliche Vorgänge (BlmSchG)
Verordnung über Anlagen zum Umgang mit wassergefährdenden Stoffen 1, 2 (AwSV)
machine generated, based on the German release by: Umweltministerium Baden-Württemberg, 06.07.2026
Stadt Kuppenheim
Friedensplatz
76456 Kuppenheim
Telefon: 07222/9462-0
Telefax: 07222/9462-150
stadt@kuppenheim.de